Featured engagements

Hydrogen — Energy Transition
Aberdeen Energy Hub
Aberdeen, Scotland
2025 - 2026
FIVAIVSBCH₂
First-of-kind integrity assessment on high-pressure hydrogen tubing at a UK energy transition facility.
Challenge

A high-pressure hydrogen tubing scope required a defensible vibration and fatigue assessment in an operating context where conventional hydrocarbon assumptions were not directly transferable.

Approach

Emveedo applied EI 3160 methodology across the tubing systems, documenting hydrogen-specific adjustments with reference to ASME B31.12 and relevant hydrogen service guidance.

Outcome

The work established a clear integrity baseline before commissioning, identified lines requiring support modification, and created a repeatable technical basis for future hydrogen assessments.

H₂
Hydrogen tubing integrity baseline established
EI 3160
Methodology adapted for hydrogen service
100%
Lines screened before commissioning
Chemicals — FEED Design Review
Undisclosed Chemical Major
Undisclosed, UK
2024
FIVAIVSBCFEED
Independent cold-eye review identified non-conservative vibration assumptions before detailed design commitment.
Challenge

The client required an independent view of FEED-stage vibration screening, separate from the EPC team that had produced the original design and assessment.

Approach

Emveedo carried out an independent FIV, AIV, and SBC assessment using FEED documentation, checking each excitation mechanism against EI 3160 criteria and documenting divergence from prior conclusions. [12 lines]

Outcome

Several assumptions were found to be non-conservative, and support modifications were defined before detailed design commitment, avoiding later-stage rework and strengthening the client’s technical basis.

FEED
Issues identified before detailed design commitment
12 lines
Reclassified after independent review
TA retained
Engagement extended into later phase support

Additional engagements

FEED Design Review
2024
North Sea
FIVAIVSBCFEED

Independent review of FEED vibration design assumptions across all major excitation mechanisms, with findings incorporated before detailed design commitment.

Brownfield Life Extension
2021–2024
North Sea — Multiple Platforms
FIVAIVSBCBrownfield

Multi-year integrity support across brownfield offshore assets, combining vibration screening, life extension input, and technical authority oversight.

Offshore Platform Portfolio
2022
North Sea
FIVAIVSBC

Consistent FIV, AIV, and SBC assessments across multiple offshore platforms, enabling cross-asset comparison of vibration-related integrity risk.

High Temperature Brownfield Platform
2018
North Sea
FIVAIVSBCBrownfield

Integrated piping integrity assessment for a high-temperature offshore platform, including vibration and fatigue interactions under elevated thermal conditions.

Vibration Fatigue — FPSO Fleet
2025
Offshore Ghana
FatigueFIV

Fleet-wide vibration fatigue assessments for FPSO assets approaching end of design life, supporting intervention planning and life extension decisions.

Piping Integrity Review
2021
North Sea — Brownfield
PIRBrownfield

Integrated PIR engagement covering vibration screening, pipe stress verification, dead leg review, and small-bore connection audit within a single scope.

Ready to move forward?

Discuss your project scope

Our case studies demonstrate how Principal-led technical authority delivers clear integrity positions across complex, high-consequence projects. Let's explore how we can support your challenges.

Additional project detail available on request.

Your enquiry draft

This private replica does not submit to Wix. Review the draft, then send it from your email app or download a copy. Nothing has been sent.

Open email draft